Irish data centres took 23 percent of metered electricity in 2025

The Central Statistics Office release of 7 July 2026 reports that data centres used 23 percent of Ireland's total metered electricity consumption in 2025, up from 5 percent in 2015, and that their consumption rose from 6,973 gigawatt hours in 2024 to 7,663 gigawatt hours in 2025, a rise of 10 percent.

The verdict

Verified

The document exists. The ledger fetched it at its publisher and quotes it.

Key facts

What the sources say

Record ID
AIA-2026-0020
Kind
Figure of record
Jurisdiction
Ireland
Last verified
Added
  • The data centre share of total metered electricity consumption rose to 23 percent in 2025 from 5 percent in 2015.
  • Metered consumption by data centres was 6,973 GWh in 2024 and 7,663 GWh in 2025.
  • Consumption by all other users, residential and other business customers, rose by 2 percent over the same period.
  • This is a national statistics office measurement, not an estimate by an industry body.

Figures

Every number, with who measured it and when

  1. 23 percent

    Data centre share of Irish metered electricity consumption in 2025

    Central Statistics Office Ireland, Data Centres Metered Electricity Consumption 2025, Key Findings, primary source, as of .

  2. 7,663 GWh

    Irish data centre metered electricity consumption in 2025

    Central Statistics Office Ireland, Data Centres Metered Electricity Consumption 2025, Key Findings, primary source, as of .

  3. 6,973 GWh

    Irish data centre metered electricity consumption in 2024

    Central Statistics Office Ireland, Data Centres Metered Electricity Consumption 2025, Key Findings, primary source, as of .

What it changes

For an operator, a utility or a community

An operator arguing that data centre load is a small share of any national grid should know that one European country has already passed a quarter. A utility can see what a decade of unconditioned connection produces on a small system. A community anywhere can ask its own statistics office for the same measurement, because Ireland shows that it can be produced from metering data.

Sources

What this record was verified against

  1. Central Statistics Office Ireland, Data Centres Metered Electricity Consumption 2025, Key FindingsPrimary · 7 July 2026

Related

Cite this record

Free to reuse under CC BY 4.0, with attribution. The record ID AIA-2026-0020 is permanent and is never reused.

In a sentence
According to the GAGE AI Infrastructure Atlas (as of 15 September 2026), irish data centres took 23 percent of metered electricity in 2025.
APA
GAGE (Global Academy of Generative-AI Education). (2026). Irish data centres took 23 percent of metered electricity in 2025. AI Infrastructure Atlas. Retrieved 15 September 2026, from https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0020-ireland-cso-data-centre-electricity-share
MLA
"Irish data centres took 23 percent of metered electricity in 2025." AI Infrastructure Atlas, GAGE (Global Academy of Generative-AI Education), 15 September 2026, https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0020-ireland-cso-data-centre-electricity-share.
Chicago
GAGE (Global Academy of Generative-AI Education). "Irish data centres took 23 percent of metered electricity in 2025." AI Infrastructure Atlas. Last modified 15 September 2026. https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0020-ireland-cso-data-centre-electricity-share.
Permalink
https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0020-ireland-cso-data-centre-electricity-share

Last updated . Every record re verified . The ledger is checked monthly, first Monday, and the same day for any regulator decision on large loads or water.

Back to the full ledger, or every record for Ireland and every figure of record record.

GAGE briefings tell you which AI regulation deadlines are coming, what they actually require of you, and when a program opens.