Skip to main content

Free public instrument from GAGE

The AI Infrastructure Atlas

As of September 2026 this ledger holds 35 records across 10 jurisdictions: 24 verified at a primary source, 6 reported by a secondary source, 0 announced with no document yet, 1 searched and absent, and 4 open questions. By kind: grid and large load rules 4, water rules 6, reporting and efficiency duties 8, siting, permitting and tax 7, figure of record 6, open question 4.

35
Records

10 jurisdictions, 35 primary sources

24
Verified at the source

6 more reported, primary not reached

1
Announced or absent

0 announced with no document, 1 searched and absent

4
Open questions

Posed, sourced, not answered

As of 15 September 2026 the GAGE AI Infrastructure Atlas records 24 verified instruments, 6 reported at a secondary source, 0 announcements without a document, 1 absences and 4 open questions, across 10 jurisdictions. Counts are a floor, not a ceiling: an instrument the ledger has not found is not on it.

Why this ledger exists

AI infrastructure is becoming political infrastructure

Electricity, grid connections, water, land and who pays for the upgrades are now AI policy questions, decided by utility commissions, grid operators, water authorities and finance ministries rather than by AI regulators. The documents are scattered across dockets, delegated regulations and national strategies, and most summaries of them quote each other.

This atlas keeps the record of who decides, what must be reported, and the figures that were actually measured, each one at its publisher with its date. The US state by state energy record already lives on the AI Energy Policy Tracker; this atlas carries what it does not, and points at it where a state matters.

Every row is fetched at its source where the source could be reached, and says so where it could not. The verdict language is the discipline: a reader learns five words once and never has to guess what a row claims.

  • Verified

    The document exists. The ledger fetched it at its publisher and quotes it.

  • Reported, primary not reached

    A reliable secondary source carries it, and the primary document could not be reached. Printed with this label, never as verified.

  • Announced, no document yet

    A body has said it will act. No document exists yet, so the row records the statement and nothing more.

  • Absent

    The ledger searched and found no instrument. The record says where it looked and when.

  • Open question

    No settled answer exists. The ledger poses the question, links the live debate, and does not answer it.

Side by side

Every jurisdiction, counted by verdict and by kind

  • United States

    13 records

    Verified
    7
    Reported
    3
    Announced
    0
    Absent
    1
    Open question
    2

    1 grid and large load rules, 4 water rules, 2 reporting and efficiency duties, 2 siting, permitting and tax, 2 figure of record, 2 open question.

  • European Union

    7 records

    Verified
    7
    Reported
    0
    Announced
    0
    Absent
    0
    Open question
    0

    1 water rules, 4 reporting and efficiency duties, 1 siting, permitting and tax, 1 figure of record.

  • Ireland

    2 records

    Verified
    2
    Reported
    0
    Announced
    0
    Absent
    0
    Open question
    0

    1 grid and large load rules, 1 figure of record.

  • Netherlands

    1 record

    Verified
    0
    Reported
    1
    Announced
    0
    Absent
    0
    Open question
    0

    1 siting, permitting and tax.

  • Germany

    1 record

    Verified
    1
    Reported
    0
    Announced
    0
    Absent
    0
    Open question
    0

    1 reporting and efficiency duties.

  • United Kingdom

    3 records

    Verified
    3
    Reported
    0
    Announced
    0
    Absent
    0
    Open question
    0

    1 grid and large load rules, 2 siting, permitting and tax.

  • Singapore

    1 record

    Verified
    1
    Reported
    0
    Announced
    0
    Absent
    0
    Open question
    0

    1 grid and large load rules.

  • China

    2 records

    Verified
    1
    Reported
    1
    Announced
    0
    Absent
    0
    Open question
    0

    1 reporting and efficiency duties, 1 siting, permitting and tax.

  • Malaysia

    1 record

    Verified
    0
    Reported
    1
    Announced
    0
    Absent
    0
    Open question
    0

    1 water rules.

  • Global

    4 records

    Verified
    2
    Reported
    0
    Announced
    0
    Absent
    0
    Open question
    2

    2 figure of record, 2 open question.

Figures of record

Every number on this ledger, with who measured it and when

42 figures, each one printed in the unit its publisher used, beside the publisher and the date it was true. Nothing here is summed across sources, converted between units, or forecast.

  1. 1.2 PUE ratio

    Power usage effectiveness ceiling for German data centres commissioned from 1 July 2026. Germany wrote data centre efficiency into statute: PUE, renewables and waste heat

    Energieeffizienzgesetz section 11, klimaneutrale Rechenzentren, gesetze-im-internet.de, primary source, as of .

  2. 1.3 PUE ratio

    Power usage effectiveness ceiling for existing German data centres from 1 July 2030. Germany wrote data centre efficiency into statute: PUE, renewables and waste heat

    Energieeffizienzgesetz section 11, klimaneutrale Rechenzentren, gesetze-im-internet.de, primary source, as of .

  3. 1.5 PUE ratio

    Power usage effectiveness ceiling for existing German data centres from 1 July 2027. Germany wrote data centre efficiency into statute: PUE, renewables and waste heat

    Energieeffizienzgesetz section 11, klimaneutrale Rechenzentren, gesetze-im-internet.de, primary source, as of .

  4. 4,211 billion kilowatthours

    EIA forecast of US electricity consumption in 2027, published September 2026. The EIA forecasts record US electricity consumption in 2026 and 2027

    US Energy Information Administration, Short Term Energy Outlook, primary source, as of .

  5. 4,135 billion kilowatthours

    EIA forecast of US electricity consumption in 2026, published September 2026. The EIA forecasts record US electricity consumption in 2026 and 2027

    US Energy Information Administration, Short Term Energy Outlook, primary source, as of .

  6. 10,000,000,000 euros

    EuroHPC investment in supercomputing and AI factories across 2021 to 2027. Europe's public compute build: 19 AI factories and 13 antennas

    European Commission, AI Factories, primary source, as of .

  7. 13 antennas

    AI factory antennas selected, as counted by the Commission. Europe's public compute build: 19 AI factories and 13 antennas

    European Commission, AI Factories, primary source, as of .

  8. 19 AI factories

    AI factories established, as counted by the Commission. Europe's public compute build: 19 AI factories and 13 antennas

    European Commission, AI Factories, primary source, as of .

  9. 5,000,000 litres per day

    Reported daily throughput of one Johor reclaimed water treatment plant. Malaysia is conditioning data centre approvals on water, and pushing reclaimed supply

    Bernama, Allaying Johor data centre water fears, secondary source, as of .

  10. 2,000,000 litres per day

    Reported daily cooling water use per data facility in Johor. Malaysia is conditioning data centre approvals on water, and pushing reclaimed supply

    Bernama, Allaying Johor data centre water fears, secondary source, as of .

  11. 180 days

    Notice period before a definitive step, as the bill would require. A House bill would force disclosure before an AI data center site is fixed

    H.R. 8488, AI Data Center Site Selection Transparency Act of 2026, GovInfo, primary source, as of .

  12. 25 MW

    Peak demand at which the bill's reporting duty attaches. A Senate bill would make data centers above 25 MW report energy and water use

    S. 4213, Data Center Water and Energy Transparency Act of 2026, GovInfo, primary source, as of .

  13. 7,663 GWh

    Irish data centre metered electricity consumption in 2025. Irish data centres took 23 percent of metered electricity in 2025

    Central Statistics Office Ireland, Data Centres Metered Electricity Consumption 2025, Key Findings, primary source, as of .

  14. 23 percent

    Data centre share of Irish metered electricity consumption in 2025. Irish data centres took 23 percent of metered electricity in 2025

    Central Statistics Office Ireland, Data Centres Metered Electricity Consumption 2025, Key Findings, primary source, as of .

  15. 80 percent

    Share of annual demand to be met with additional Irish renewable projects. Ireland made grid access conditional: the CRU large energy user connection policy

    Commission for Regulation of Utilities, decision on new electricity connection policy for data centres, primary source, as of .

  16. 20 MW

    Large load threshold in the proposed reforms, as reported by counsel. The Energy Secretary told FERC to write interconnection rules for large loads

    K&L Gates, DOE Directs FERC to Take Action on Large Load Interconnection, secondary source, as of .

  17. 681 respondents

    Respondents answering the annual PUE question. Measured efficiency has not moved: a weighted average PUE of 1.54

    Uptime Institute Global Data Center Survey 2025, primary source, as of .

  18. 1.54 PUE ratio

    Weighted average annual power usage effectiveness reported in the 2025 survey. Measured efficiency has not moved: a weighted average PUE of 1.54

    Uptime Institute Global Data Center Survey 2025, primary source, as of .

  19. 100 MW

    Incremental electric load addition that makes a project qualifying under EO 14318. Executive Order 14318 puts qualifying data center projects on a federal fast track

    The White House, Accelerating Federal Permitting of Data Center Infrastructure, primary source, as of .

  20. 500,000,000 US dollars

    Capital expenditure that makes a project qualifying under EO 14318. Executive Order 14318 puts qualifying data center projects on a federal fast track

    The White House, Accelerating Federal Permitting of Data Center Infrastructure, primary source, as of .

  21. 2.4 percent

    Share of EU wastewater reused, as printed in the strategy. The EU Water Resilience Strategy names data centres and promises water standards

    European Water Resilience Strategy, COM(2025) 280 final, EUR-Lex, primary source, as of .

  22. 10 percent improvement

    EU water efficiency aim stated in the strategy, for 2030. The EU Water Resilience Strategy names data centres and promises water standards

    European Water Resilience Strategy, COM(2025) 280 final, EUR-Lex, primary source, as of .

  23. 945 TWh

    IEA base case projection for 2030, published April 2025. The global figure of record: 415 TWh of data centre electricity in 2024

    International Energy Agency, Energy and AI, executive summary, primary source, as of .

  24. 6,973 GWh

    Irish data centre metered electricity consumption in 2024. Irish data centres took 23 percent of metered electricity in 2025

    Central Statistics Office Ireland, Data Centres Metered Electricity Consumption 2025, Key Findings, primary source, as of .

  25. 1.5 percent

    Global data centre share of world electricity consumption in 2024. The global figure of record: 415 TWh of data centre electricity in 2024

    International Energy Agency, Energy and AI, executive summary, primary source, as of .

  26. 415 TWh

    Global data centre electricity consumption in 2024. The global figure of record: 415 TWh of data centre electricity in 2024

    International Energy Agency, Energy and AI, executive summary, primary source, as of .

  27. 580 TWh

    Report projection for 2028, high end of the published range. The measured US figure of record: 176 TWh, 4.4 percent of national electricity in 2023

    US Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, primary source, as of .

  28. 325 TWh

    Report projection for 2028, low end of the published range. The measured US figure of record: 176 TWh, 4.4 percent of national electricity in 2023

    US Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, primary source, as of .

  29. 10 percent per year

    Annual increase in renewable energy utilisation rate set by the plan. China set a national data centre efficiency target and a renewables ramp

    The State Council of the People's Republic of China, China sets green targets for data centers, primary source, as of .

  30. 1.5 PUE ratio

    Average data centre power usage effectiveness target for 2025. China set a national data centre efficiency target and a renewables ramp

    The State Council of the People's Republic of China, China sets green targets for data centers, primary source, as of .

  31. 1.3 PUE ratio

    Power usage effectiveness target for supported data centres. Singapore allocates data centre capacity, and the allocation is the rule

    IMDA factsheet, Charting green growth pathways at scale for data centres in Singapore, primary source, as of .

  32. 1.4 GW

    Existing Singapore data centre capacity stated in the factsheet. Singapore allocates data centre capacity, and the allocation is the rule

    IMDA factsheet, Charting green growth pathways at scale for data centres in Singapore, primary source, as of .

  33. 300 MW

    Additional data centre capacity offered in the near term under the roadmap. Singapore allocates data centre capacity, and the allocation is the rule

    IMDA factsheet, Charting green growth pathways at scale for data centres in Singapore, primary source, as of .

  34. 500 kW

    Installed IT power at which the reporting scheme applies. The EU data centre reporting scheme: what must be filed, and by when

    Commission Delegated Regulation (EU) 2024/1364, EUR-Lex, primary source, as of .

  35. 4.4 percent

    US data center share of total electricity in 2023. The measured US figure of record: 176 TWh, 4.4 percent of national electricity in 2023

    US Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, primary source, as of .

  36. 176 TWh

    US data center electricity use in 2023. The measured US figure of record: 176 TWh, 4.4 percent of national electricity in 2023

    US Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, primary source, as of .

  37. 1 MW

    Installed IT power above which Member States must encourage the Code of Conduct. EU law: data centres above 500 kW must publish their performance

    Directive (EU) 2023/1791 on energy efficiency, Article 12, EUR-Lex, primary source, as of .

  38. 500 kW

    Installed IT power at which the Article 12 duty attaches. EU law: data centres above 500 kW must publish their performance

    Directive (EU) 2023/1791 on energy efficiency, Article 12, EUR-Lex, primary source, as of .

  39. 550 MVA

    Haarlemmermeer local growth allowance to 2030, as reported. The Netherlands capped hyperscale data centres by hectares and megawatts

    DLA Piper, Data centers in the Netherlands, a shifting landscape, secondary source, as of .

  40. 670 MVA

    Amsterdam local growth allowance to 2030, as reported. The Netherlands capped hyperscale data centres by hectares and megawatts

    DLA Piper, Data centers in the Netherlands, a shifting landscape, secondary source, as of .

  41. 70 MW

    Electrical power in the reported Dutch hyperscale definition. The Netherlands capped hyperscale data centres by hectares and megawatts

    DLA Piper, Data centers in the Netherlands, a shifting landscape, secondary source, as of .

  42. 10 hectares

    Site area in the reported Dutch hyperscale definition. The Netherlands capped hyperscale data centres by hectares and megawatts

    DLA Piper, Data centers in the Netherlands, a shifting landscape, secondary source, as of .

The ledger

Every record, newest first

35 records. Each row opens a page carrying the answer, the verdict and what it means, the key facts, the figures with their sources, what it changes for an operator, a utility or a community, and the sources it was verified against.

RecordVerdictWhereKindVerified
Open question: is AI training load interruptible, and who gets to say soAIA-2026-0035Open questionGlobalOpen question
Open question: does behind the meter generation escape interconnection rulesAIA-2026-0034Open questionUnited StatesOpen question
Open question: should a data center's water use be public, site by siteAIA-2026-0033Open questionUnited StatesOpen question
Open question: who pays if a data center cancels after the grid was rebuilt for itAIA-2026-0032Open questionGlobalOpen question
Measured efficiency has not moved: a weighted average PUE of 1.54AIA-2026-0031VerifiedGlobalFigure of record
The global figure of record: 415 TWh of data centre electricity in 2024AIA-2026-0030VerifiedGlobalFigure of record
Malaysia is conditioning data centre approvals on water, and pushing reclaimed supplyAIA-2026-0029Reported, primary not reachedMalaysiaWater rules
East Data West Computing moves Chinese compute to where the power isAIA-2026-0028Reported, primary not reachedChinaSiting, permitting and tax
China set a national data centre efficiency target and a renewables rampAIA-2026-0027VerifiedChinaReporting and efficiency duties
Singapore allocates data centre capacity, and the allocation is the ruleAIA-2026-0026VerifiedSingaporeGrid and large load rules
Britain reordered its grid queue: Gate 1 and Gate 2 connection offersAIA-2026-0025VerifiedUnited KingdomGrid and large load rules
UK data centres became Critical National Infrastructure in September 2024AIA-2026-0024VerifiedUnited KingdomSiting, permitting and tax
The UK created AI Growth Zones to move data centres through planningAIA-2026-0023VerifiedUnited KingdomSiting, permitting and tax
Germany wrote data centre efficiency into statute: PUE, renewables and waste heatAIA-2026-0022VerifiedGermanyReporting and efficiency duties
The Netherlands capped hyperscale data centres by hectares and megawattsAIA-2026-0021Reported, primary not reachedNetherlandsSiting, permitting and tax
Irish data centres took 23 percent of metered electricity in 2025AIA-2026-0020VerifiedIrelandFigure of record
Ireland made grid access conditional: the CRU large energy user connection policyAIA-2026-0019VerifiedIrelandGrid and large load rules
Europe's public compute build: 19 AI factories and 13 antennasAIA-2026-0018VerifiedEuropean UnionFigure of record
The Cloud and AI Development Act proposal ties European compute capacity to energy efficiencyAIA-2026-0017VerifiedEuropean UnionSiting, permitting and tax
The EU Water Resilience Strategy names data centres and promises water standardsAIA-2026-0016VerifiedEuropean UnionWater rules
The Commission is preparing minimum performance standards for EU data centresAIA-2026-0015VerifiedEuropean UnionReporting and efficiency duties
Europe collects site level data centre figures and keeps them confidentialAIA-2026-0014VerifiedEuropean UnionReporting and efficiency duties
The EU data centre reporting scheme: what must be filed, and by whenAIA-2026-0013VerifiedEuropean UnionReporting and efficiency duties
EU law: data centres above 500 kW must publish their performanceAIA-2026-0012VerifiedEuropean UnionReporting and efficiency duties
Georgia SB 421 would stop local governments hiding data center water and power figuresAIA-2026-0011Reported, primary not reachedUnited StatesWater rules
State legislatures, not Washington, are writing the data center water rulesAIA-2026-0010Reported, primary not reachedUnited StatesWater rules
No federal rule requires a United States data center to disclose its water useAIA-2026-0009AbsentUnited StatesWater rules
The EPA says it will not set nationwide environmental requirements for data centersAIA-2026-0008Reported, primary not reachedUnited StatesWater rules
A House bill would force disclosure before an AI data center site is fixedAIA-2026-0007VerifiedUnited StatesSiting, permitting and tax
The House companion to the data center water and energy reporting billAIA-2026-0006VerifiedUnited StatesReporting and efficiency duties
A Senate bill would make data centers above 25 MW report energy and water useAIA-2026-0005VerifiedUnited StatesReporting and efficiency duties
The measured US figure of record: 176 TWh, 4.4 percent of national electricity in 2023AIA-2026-0004VerifiedUnited StatesFigure of record
The EIA forecasts record US electricity consumption in 2026 and 2027AIA-2026-0003VerifiedUnited StatesFigure of record
Executive Order 14318 puts qualifying data center projects on a federal fast trackAIA-2026-0002VerifiedUnited StatesSiting, permitting and tax
The Energy Secretary told FERC to write interconnection rules for large loadsAIA-2026-0001VerifiedUnited StatesGrid and large load rules

Answers

What people ask the AI Infrastructure Atlas

How much electricity do data centers use?

The atlas prints only figures a publisher measured or projected under its own name: Measured efficiency has not moved: a weighted average PUE of 1.54; The global figure of record: 415 TWh of data centre electricity in 2024; Irish data centres took 23 percent of metered electricity in 2025; Europe's public compute build: 19 AI factories and 13 antennas; and more. Each figure carries its publisher, its unit and its date on the figures of record list, and none is summed with another as of September 2026.

Who decides whether a data center can connect to the grid?

4 grid records: Singapore allocates data centre capacity, and the allocation is the rule (Singapore, verified); Britain reordered its grid queue: Gate 1 and Gate 2 connection offers (United Kingdom, verified); Ireland made grid access conditional: the CRU large energy user connection policy (Ireland, verified); The Energy Secretary told FERC to write interconnection rules for large loads (United States, verified).

Are data centers required to disclose water use?

6 water records on the atlas: Malaysia is conditioning data centre approvals on water, and pushing reclaimed supply (Malaysia, reported, primary not reached); The EU Water Resilience Strategy names data centres and promises water standards (European Union, verified); Georgia SB 421 would stop local governments hiding data center water and power figures (United States, reported, primary not reached); State legislatures, not Washington, are writing the data center water rules (United States, reported, primary not reached); No federal rule requires a United States data center to disclose its water use (United States, absent); The EPA says it will not set nationwide environmental requirements for data centers (United States, reported, primary not reached). An absent record means the atlas searched and found no rule, and says where it looked.

What must a data center in the European Union report?

Europe's public compute build: 19 AI factories and 13 antennas; The Cloud and AI Development Act proposal ties European compute capacity to energy efficiency; The EU Water Resilience Strategy names data centres and promises water standards; The Commission is preparing minimum performance standards for EU data centres; Europe collects site level data centre figures and keeps them confidential; The EU data centre reporting scheme: what must be filed, and by when; EU law: data centres above 500 kW must publish their performance. The record pages quote the provision, the deadline it fixes and the body that receives the report.

Who decides whether a data center connects, and on what terms?

4 records of kind grid and large load rules are on the AI Infrastructure Atlas as of September 2026: Singapore allocates data centre capacity, and the allocation is the rule; Britain reordered its grid queue: Gate 1 and Gate 2 connection offers; Ireland made grid access conditional: the CRU large energy user connection policy; The Energy Secretary told FERC to write interconnection rules for large loads. Each has its own page with the verdict, the facts, the sources it was checked against and the date.

Who decides what a data center may draw and must disclose?

6 records of kind water rules are on the AI Infrastructure Atlas as of September 2026: Malaysia is conditioning data centre approvals on water, and pushing reclaimed supply; The EU Water Resilience Strategy names data centres and promises water standards; Georgia SB 421 would stop local governments hiding data center water and power figures; State legislatures, not Washington, are writing the data center water rules; No federal rule requires a United States data center to disclose its water use; The EPA says it will not set nationwide environmental requirements for data centers. Each has its own page with the verdict, the facts, the sources it was checked against and the date.

What must a data center report, and to whom?

8 records of kind reporting and efficiency duties are on the AI Infrastructure Atlas as of September 2026: China set a national data centre efficiency target and a renewables ramp; Germany wrote data centre efficiency into statute: PUE, renewables and waste heat; The Commission is preparing minimum performance standards for EU data centres; Europe collects site level data centre figures and keeps them confidential; The EU data centre reporting scheme: what must be filed, and by when; EU law: data centres above 500 kW must publish their performance; and 2 more. Each has its own page with the verdict, the facts, the sources it was checked against and the date.

Who decides where it may be built, and what it pays?

7 records of kind siting, permitting and tax are on the AI Infrastructure Atlas as of September 2026: East Data West Computing moves Chinese compute to where the power is; UK data centres became Critical National Infrastructure in September 2024; The UK created AI Growth Zones to move data centres through planning; The Netherlands capped hyperscale data centres by hectares and megawatts; The Cloud and AI Development Act proposal ties European compute capacity to energy efficiency; A House bill would force disclosure before an AI data center site is fixed; and 1 more. Each has its own page with the verdict, the facts, the sources it was checked against and the date.

What has actually been measured?

6 records of kind figure of record are on the AI Infrastructure Atlas as of September 2026: Measured efficiency has not moved: a weighted average PUE of 1.54; The global figure of record: 415 TWh of data centre electricity in 2024; Irish data centres took 23 percent of metered electricity in 2025; Europe's public compute build: 19 AI factories and 13 antennas; The measured US figure of record: 176 TWh, 4.4 percent of national electricity in 2023; The EIA forecasts record US electricity consumption in 2026 and 2027. Each has its own page with the verdict, the facts, the sources it was checked against and the date.

What has nobody settled?

4 records of kind open question are on the AI Infrastructure Atlas as of September 2026: Open question: is AI training load interruptible, and who gets to say so; Open question: does behind the meter generation escape interconnection rules; Open question: should a data center's water use be public, site by site; Open question: who pays if a data center cancels after the grid was rebuilt for it. Each has its own page with the verdict, the facts, the sources it was checked against and the date.

What do the verdicts mean?

Verified: the document exists and the ledger fetched it at its publisher. Reported: a reliable secondary source carries it and the primary could not be reached. Announced: a body said it will act and no document exists. Absent: the ledger searched and found nothing, and the search is written into the record. Open: a question nobody has settled, posed and not answered.

How current is the AI Infrastructure Atlas?

Every record carries the date it was last verified; the ledger as a whole was last verified 15 September 2026 and holds 35 records with 35 primary sources. A change moves the record's own date and appears on the changelog, so a reader who cited a row can see whether it moved.

Every surface

Cut the ledger the way you need it

By jurisdiction

By kind

Every record page

Take the data

The whole dataset, free, in two formats

Licensed CC BY 4.0. Use it in an article, a paper, a slide or a product. The only condition is attribution, and the citation page gives you the line to paste.

How the ledger is built, what the verdicts mean, and what the gate refuses: the method page. Every change, dated: the changelog. The kinds on the shelf: grid and large load rules, water rules, reporting and efficiency duties, siting, permitting and tax, figure of record, open question. Something missing or wrong is a bug, and we want to hear about it. The United States state by state record is on the US AI Energy Policy Tracker. The other input the models compete for, recorded hours, is on the Embodied AI Data Ledger.

Cite this page

Free to reuse under CC BY 4.0, with attribution.

In a sentence
According to the GAGE AI Infrastructure Atlas (as of 15 September 2026), ai infrastructure atlas.
APA
GAGE (Global Academy of Generative-AI Education). (2026). AI Infrastructure Atlas. AI Infrastructure Atlas. Retrieved 15 September 2026, from https://www.gage.academy/tools/ai-infrastructure-atlas
MLA
"AI Infrastructure Atlas." AI Infrastructure Atlas, GAGE (Global Academy of Generative-AI Education), 15 September 2026, https://www.gage.academy/tools/ai-infrastructure-atlas.
Chicago
GAGE (Global Academy of Generative-AI Education). "AI Infrastructure Atlas." AI Infrastructure Atlas. Last modified 15 September 2026. https://www.gage.academy/tools/ai-infrastructure-atlas.
Permalink
https://www.gage.academy/tools/ai-infrastructure-atlas

Last updated . Every record re verified . The ledger is checked monthly, first Monday, and the same day for any regulator decision on large loads or water.

1.2 PUE ratio

GAGE briefings tell you which AI regulation deadlines are coming, what they actually require of you, and when a program opens.