Skip to main content

The measured US figure of record: 176 TWh, 4.4 percent of national electricity in 2023

The 2024 United States Data Center Energy Usage Report, prepared at Lawrence Berkeley National Laboratory and released by the Department of Energy on 20 December 2024, put data center electricity use at 176 TWh in 2023, about 4.4 percent of total United States electricity, and projected a range of 325 to 580 TWh by 2028.

The verdict

Verified

The document exists. The ledger fetched it at its publisher and quotes it.

Key facts

What the sources say

Record ID
AIA-2026-0004
Kind
Figure of record
Jurisdiction
United States
Last verified
Added
  • Data centers consumed about 4.4 percent of total US electricity in 2023, on the report's own accounting.
  • The measured figure for 2023 is 176 TWh.
  • The report's projection for 2028 is a range of 325 to 580 TWh, which it frames as approximately 6.7 to 12 percent of total US electricity.
  • The 2028 numbers are the report's projection, not a measurement.

Figures

Every number, with who measured it and when

  1. 176 TWh

    US data center electricity use in 2023

    US Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, primary source, as of .

  2. 4.4 percent

    US data center share of total electricity in 2023

    US Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, primary source, as of .

  3. 325 TWh

    Report projection for 2028, low end of the published range

    US Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, primary source, as of .

  4. 580 TWh

    Report projection for 2028, high end of the published range

    US Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers, primary source, as of .

What it changes

For an operator, a utility or a community

An operator quoting a national share in a planning hearing should quote this one and say which year it measures. A utility should note that the range for 2028 is wide enough to carry two different capital plans, so a single point estimate taken from it is an argument, not a fact. A community should ask whether a local claim about percentage of grid load came from this report or from a vendor's own extrapolation.

Sources

What this record was verified against

  1. US Department of Energy, DOE Releases New Report Evaluating Increase in Electricity Demand from Data CentersPrimary · 20 December 2024

Related

Cite this record

Free to reuse under CC BY 4.0, with attribution. The record ID AIA-2026-0004 is permanent and is never reused.

In a sentence
According to the GAGE AI Infrastructure Atlas (as of 15 September 2026), the measured us figure of record: 176 twh, 4.4 percent of national electricity in 2023.
APA
GAGE (Global Academy of Generative-AI Education). (2026). The measured US figure of record: 176 TWh, 4.4 percent of national electricity in 2023. AI Infrastructure Atlas. Retrieved 15 September 2026, from https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0004-lbnl-2024-us-data-center-energy-usage-report
MLA
"The measured US figure of record: 176 TWh, 4.4 percent of national electricity in 2023." AI Infrastructure Atlas, GAGE (Global Academy of Generative-AI Education), 15 September 2026, https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0004-lbnl-2024-us-data-center-energy-usage-report.
Chicago
GAGE (Global Academy of Generative-AI Education). "The measured US figure of record: 176 TWh, 4.4 percent of national electricity in 2023." AI Infrastructure Atlas. Last modified 15 September 2026. https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0004-lbnl-2024-us-data-center-energy-usage-report.
Permalink
https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0004-lbnl-2024-us-data-center-energy-usage-report

Last updated . Every record re verified . The ledger is checked monthly, first Monday, and the same day for any regulator decision on large loads or water.

Back to the full ledger, or every record for United States and every figure of record record.

GAGE briefings tell you which AI regulation deadlines are coming, what they actually require of you, and when a program opens.