The global figure of record: 415 TWh of data centre electricity in 2024

The International Energy Agency report Energy and AI, published 10 April 2025, states that data centres accounted for around 1.5 percent of the world's electricity consumption in 2024, or 415 terawatt hours, and that data centre electricity consumption is set to more than double to around 945 terawatt hours by 2030.

The verdict

Verified

The document exists. The ledger fetched it at its publisher and quotes it.

Key facts

What the sources say

Record ID
AIA-2026-0030
Kind
Figure of record
Jurisdiction
Global
Last verified
Added
  • Data centres accounted for around 1.5 percent of world electricity consumption in 2024, or 415 TWh.
  • The agency's base case has data centre electricity consumption more than doubling to around 945 TWh by 2030.
  • The 945 TWh number is the agency's own projection published in April 2025, not a measurement.
  • The 2024 figure is global and covers all data centres, not AI workloads alone.

Figures

Every number, with who measured it and when

  1. 415 TWh

    Global data centre electricity consumption in 2024

    International Energy Agency, Energy and AI, executive summary, primary source, as of .

  2. 1.5 percent

    Global data centre share of world electricity consumption in 2024

    International Energy Agency, Energy and AI, executive summary, primary source, as of .

  3. 945 TWh

    IEA base case projection for 2030, published April 2025

    International Energy Agency, Energy and AI, executive summary, primary source, as of .

What it changes

For an operator, a utility or a community

An operator answering the question of how much of the world's power AI uses should quote this figure and the year, and should say plainly that the larger number is a projection. A utility can anchor a load forecast argument in a source no party can call partisan. A community should check whether a local claim used the 2024 measurement or the 2030 projection, because they are six years and one assumption apart.

Sources

What this record was verified against

  1. International Energy Agency, Energy and AI, executive summaryPrimary · 10 April 2025

Related

Cite this record

Free to reuse under CC BY 4.0, with attribution. The record ID AIA-2026-0030 is permanent and is never reused.

In a sentence
According to the GAGE AI Infrastructure Atlas (as of 15 September 2026), the global figure of record: 415 twh of data centre electricity in 2024.
APA
GAGE (Global Academy of Generative-AI Education). (2026). The global figure of record: 415 TWh of data centre electricity in 2024. AI Infrastructure Atlas. Retrieved 15 September 2026, from https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0030-iea-energy-and-ai-data-centre-electricity
MLA
"The global figure of record: 415 TWh of data centre electricity in 2024." AI Infrastructure Atlas, GAGE (Global Academy of Generative-AI Education), 15 September 2026, https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0030-iea-energy-and-ai-data-centre-electricity.
Chicago
GAGE (Global Academy of Generative-AI Education). "The global figure of record: 415 TWh of data centre electricity in 2024." AI Infrastructure Atlas. Last modified 15 September 2026. https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0030-iea-energy-and-ai-data-centre-electricity.
Permalink
https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0030-iea-energy-and-ai-data-centre-electricity

Last updated . Every record re verified . The ledger is checked monthly, first Monday, and the same day for any regulator decision on large loads or water.

Back to the full ledger, or every record for Global and every figure of record record.

GAGE briefings tell you which AI regulation deadlines are coming, what they actually require of you, and when a program opens.