Global: AI Infrastructure Atlas
Global carries 4 records on the AI Infrastructure Atlas as of September 2026: 2 verified at a primary source, 0 reported, 0 announced with no document yet, 0 searched and absent, and 2 open questions. By kind: figure of record 2, open question 2.
Figure of record
2 records
Measured efficiency has not moved: a weighted average PUE of 1.54
Global · verified 15 September 2026
The weighted average annual PUE reported by respondents in 2025 was 1.54.
The global figure of record: 415 TWh of data centre electricity in 2024
Global · verified 15 September 2026
Data centres accounted for around 1.5 percent of world electricity consumption in 2024, or 415 TWh.
Open question
2 records
Open question: is AI training load interruptible, and who gets to say so
Global · verified 15 September 2026
China's East Data West Computing sorts workloads by latency tolerance, which is the closest thing in this atlas to a flexibility rule, and it is a siting policy rather than a dispatch right.
Open question: who pays if a data center cancels after the grid was rebuilt for it
Global · verified 15 September 2026
Britain's Gate 2 test asks whether a project is ready and needed before it holds a queue position, which reduces speculative requests but does not price a later cancellation.
Answers
What people ask about Global
What has actually been measured in Global?
Measured efficiency has not moved: a weighted average PUE of 1.54 (verified); The global figure of record: 415 TWh of data centre electricity in 2024 (verified). Each record page quotes the document and says what it changes for an operator, a utility or a community.
What has nobody settled in Global?
Open question: is AI training load interruptible, and who gets to say so (open question); Open question: who pays if a data center cancels after the grid was rebuilt for it (open question). Each record page quotes the document and says what it changes for an operator, a utility or a community.
What has nobody settled in Global?
Open question: is AI training load interruptible, and who gets to say so; Open question: who pays if a data center cancels after the grid was rebuilt for it. The ledger poses these and does not answer them.
Every surface
Cut the ledger another way
By jurisdiction
- United States13
- European Union7
- Ireland2
- Netherlands1
- Germany1
- United Kingdom3
- Singapore1
- China2
- Malaysia1
- Global4
By kind
- Grid and large load rules4
- Water rules6
- Reporting and efficiency duties8
- Siting, permitting and tax7
- Figure of record6
- Open question4
Verdicts
Cite this page
Free to reuse under CC BY 4.0, with attribution.
- In a sentence
- According to the GAGE AI Infrastructure Atlas (as of 15 September 2026), global on the ai infrastructure atlas.
- APA
- GAGE (Global Academy of Generative-AI Education). (2026). Global on the AI Infrastructure Atlas. AI Infrastructure Atlas. Retrieved 15 September 2026, from https://www.gage.academy/tools/ai-infrastructure-atlas/jurisdictions/global
- MLA
- "Global on the AI Infrastructure Atlas." AI Infrastructure Atlas, GAGE (Global Academy of Generative-AI Education), 15 September 2026, https://www.gage.academy/tools/ai-infrastructure-atlas/jurisdictions/global.
- Chicago
- GAGE (Global Academy of Generative-AI Education). "Global on the AI Infrastructure Atlas." AI Infrastructure Atlas. Last modified 15 September 2026. https://www.gage.academy/tools/ai-infrastructure-atlas/jurisdictions/global.
- Permalink
- https://www.gage.academy/tools/ai-infrastructure-atlas/jurisdictions/global
Last updated . Every record re verified . The ledger is checked monthly, first Monday, and the same day for any regulator decision on large loads or water.
Back to the full ledger.
GAGE briefings tell you which AI regulation deadlines are coming, what they actually require of you, and when a program opens.