Singapore allocates data centre capacity, and the allocation is the rule

The Infocomm Media Development Authority launched its Green Data Centre Roadmap on 30 May 2024, offering at least 300 megawatts of additional capacity in the near term with more through green energy deployments, and committing to enhanced standards and certifications for data centres at a power usage effectiveness of 1.3 or lower.

The verdict

Verified

The document exists. The ledger fetched it at its publisher and quotes it.

Key facts

What the sources say

Record ID
AIA-2026-0026
Kind
Grid and large load rules
Jurisdiction
Singapore
Last verified
Added
  • The roadmap aims to provide at least 300 MW of additional capacity in the near term, with much more through green energy deployments.
  • Singapore already hosts more than 1.4 gigawatts of data centre capacity across more than 70 cloud, enterprise and colocation facilities.
  • IMDA will co develop enhanced standards and certifications to support data centres at a power usage effectiveness of 1.3 or lower.
  • Recognised green energy sources are bioenergy, vertical building integrated and building applied photovoltaics, fuel cells with carbon capture, and low carbon hydrogen and ammonia.
  • The Tropical Data Centre methodology claims potential savings of 2 to 5 percent of energy for every one degree Celsius increase in operating temperature.

Figures

Every number, with who measured it and when

  1. 300 MW

    Additional data centre capacity offered in the near term under the roadmap

    IMDA factsheet, Charting green growth pathways at scale for data centres in Singapore, primary source, as of .

  2. 1.4 GW

    Existing Singapore data centre capacity stated in the factsheet

    IMDA factsheet, Charting green growth pathways at scale for data centres in Singapore, primary source, as of .

  3. 1.3 PUE ratio

    Power usage effectiveness target for supported data centres

    IMDA factsheet, Charting green growth pathways at scale for data centres in Singapore, primary source, as of .

What it changes

For an operator, a utility or a community

An operator in Singapore does not apply for a connection so much as compete for an allocation, and efficiency is the entry criterion. A utility elsewhere can see a worked example of rationing capacity by performance rather than by queue position. A community should note that a capacity cap makes the trade off explicit in public, which is rare.

Sources

What this record was verified against

  1. IMDA factsheet, Charting green growth pathways at scale for data centres in SingaporePrimary · 30 May 2024

Related

Cite this record

Free to reuse under CC BY 4.0, with attribution. The record ID AIA-2026-0026 is permanent and is never reused.

In a sentence
According to the GAGE AI Infrastructure Atlas (as of 15 September 2026), singapore allocates data centre capacity, and the allocation is the rule.
APA
GAGE (Global Academy of Generative-AI Education). (2026). Singapore allocates data centre capacity, and the allocation is the rule. AI Infrastructure Atlas. Retrieved 15 September 2026, from https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0026-singapore-green-data-centre-roadmap
MLA
"Singapore allocates data centre capacity, and the allocation is the rule." AI Infrastructure Atlas, GAGE (Global Academy of Generative-AI Education), 15 September 2026, https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0026-singapore-green-data-centre-roadmap.
Chicago
GAGE (Global Academy of Generative-AI Education). "Singapore allocates data centre capacity, and the allocation is the rule." AI Infrastructure Atlas. Last modified 15 September 2026. https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0026-singapore-green-data-centre-roadmap.
Permalink
https://www.gage.academy/tools/ai-infrastructure-atlas/records/AIA-2026-0026-singapore-green-data-centre-roadmap

Last updated . Every record re verified . The ledger is checked monthly, first Monday, and the same day for any regulator decision on large loads or water.

Back to the full ledger, or every record for Singapore and every grid and large load rules record.

GAGE briefings tell you which AI regulation deadlines are coming, what they actually require of you, and when a program opens.